<doi_batch xmlns="http://www.crossref.org/schema/4.4.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" version="4.4.0"><head><doi_batch_id>a145a097-18ee-43a2-a831-48dc5e2699bf</doi_batch_id><timestamp>20210219123947927</timestamp><depositor><depositor_name>wsea</depositor_name><email_address>mdt@crossref.org</email_address></depositor><registrant>MDT Deposit</registrant></head><body><journal><journal_metadata language="en"><full_title>WSEAS TRANSACTIONS ON MATHEMATICS</full_title><issn media_type="print">1109-2769</issn><doi_data><doi>10.37394/23206</doi><resource>http://wseas.org/wseas/cms.action?id=4051</resource></doi_data></journal_metadata><journal_issue><publication_date media_type="online"><month>2</month><day>7</day><year>2020</year></publication_date><publication_date media_type="print"><month>2</month><day>7</day><year>2020</year></publication_date><journal_volume><volume>19</volume><doi_data><doi>10.37394/23206.2020.19</doi><resource>http://wseas.org/wseas/cms.action?id=23185</resource></doi_data></journal_volume></journal_issue><journal_article language="en"><titles><title>The Continuous Sampling Plan for Two Production Lines: The CSP-2L</title></titles><contributors><person_name sequence="first" contributor_role="author"><given_name>Pannarat</given_name><surname>Guayjarernpanishk</surname><affiliation>Faculty of Interdisciplinary Studies, Nong Khai Campus, Khon Kaen University, TambonNong Kom Koh,Muang District, Nong Khai, 43000, THAILAND</affiliation></person_name><person_name sequence="additional" contributor_role="author"><given_name>Tawun</given_name><surname>Remsungnen</surname><affiliation>Faculty of Interdisciplinary Studies, Nong Khai Campus, Khon Kaen University, TambonNong Kom Koh,Muang District, Nong Khai, 43000, THAILAND</affiliation></person_name></contributors><jats:abstract xmlns:jats="http://www.ncbi.nlm.nih.gov/JATS1"><jats:p>This paper presents the CSP-2L continuous sampling plan, which is designed for product inspectionon two independent production lines at the same time. The purpose of the CSP-2L is to improve the CSP-1-2Lin order to reduce the number of defective products that have passed without being inspected during thetemporary inspection stop, so the quality of the products is better. Therefore, if the manufacturer who uses theCSP-2L plan to inspect the production lines then resulting in higher quality of the products than the CSP-1-2L.This presentation includes the product inspection procedures and the formulas for performance measures suchas average total fraction inspected (ATFI), average total outgoing quality (ATOQ), and average total outgoingquality limit (ATOQL) which are carried out using a Markov chain. The formulas for performance measures ofthe CSP-2L have been tested to be accurate. When defined, the probability of a unit produced by the processbeing nonconforming of line 1 and line 2 are equal (p1 = p2 = p = 0.005, 0.015 and 0.035), the clearance numberof line 1 and line 2 are equal (i1 = i2 = 10, 20, 30, 40 and 50), the sampling fraction of line 1 and line 2 are equal(f1 = f2 =12and13) and the number of units to be found when inspection of line 1 and line 2 are in the phaseof sampling inspection at the same time (m = i1 and 2i1). Moreover, the ATOQ values from the CSP-2L and theCSP-1-2L plans were compared. The results showed that, the formulas for performance measures are accurateand in the case of p, the levels are low and moderate, the ATOQ of the CSP-2L are less than those of theCSP-1-2L in all cases. But in the case of p is at a high level, the ATOQ of the CSP-2L is less than those of theCSP-1-2L for some cases of i.</jats:p></jats:abstract><publication_date media_type="online"><month>8</month><day>13</day><year>2020</year></publication_date><publication_date media_type="print"><month>8</month><day>13</day><year>2020</year></publication_date><pages><first_page>407</first_page><last_page>420</last_page></pages><ai:program xmlns:ai="http://www.crossref.org/AccessIndicators.xsd" name="AccessIndicators"><ai:free_to_read start_date="2020-08-13"/><ai:license_ref applies_to="am" start_date="2020-08-13">https://www.wseas.org/multimedia/journals/mathematics/2020/a845106-1283.pdf</ai:license_ref></ai:program><archive_locations><archive name="Portico"/></archive_locations><doi_data><doi>10.37394/23206.2020.19.42</doi><resource>https://www.wseas.org/multimedia/journals/mathematics/2020/a845106-1283.pdf</resource></doi_data><citation_list><citation key="ref0"><doi>10.1109/eecs.2018.00054</doi><unstructured_citation>Abderrahman  Rhouzali,  Benayad  Nsiri,  Mounia Miyara,  Mohamed Abid,  Method  Of  Modeling  Of The  Control  Systems  Adapted  To  The  Skills Production  Systems,    International    Journal    of Circuits,  Systems  and  Signal  Processing,  Vol.13, 2019,pp. 385-390.</unstructured_citation></citation><citation key="ref1"><unstructured_citation>Guo-cheng Niu and Zhen Hu, Evaluation and Health Status Prediction Method of Beer Filling Production Line   Based   on   Data   Mining   Technology, International   Journal   of   Circuits,   Systems   and Signal Processing, Vol.13, 2019,pp. 306-311.</unstructured_citation></citation><citation key="ref2"><unstructured_citation>Yaling  Qin  and  Dequan  Yue,  A  Perishable Production Inventory System with Service Time and Its Performance Evaluation, International Journal of Circuits,  Systems  and  Signal  Processing,  Vol.13, 2019,pp. 148-155.</unstructured_citation></citation><citation key="ref3"><doi>10.1214/aoms/1177731420</doi><unstructured_citation>H. F. Dodge,  A  Sampling  inspection  plan  for continuous  production,Annals   of   Mathematical Statistics,Vol. 14, No. 3, 1943, pp. 264-279.</unstructured_citation></citation><citation key="ref4"><unstructured_citation>H.F. Dodge  and  M. N. Torrey,Additional Continuous  Sampling  Inspection  Plans, Industrial Quality Control. Vol.7, No. 5, 1951, pp.7-12.</unstructured_citation></citation><citation key="ref5"><doi>10.1214/aoms/1177728428</doi><unstructured_citation>G. J. Lieberman  and  H. Solomon,  Multi-Level Continuous    Sampling    Plans, Annals of Mathematical  Statistics. Vol. 26, No. 4,  1955,  pp. 686-704.</unstructured_citation></citation><citation key="ref6"><doi>10.1080/02664769822945</doi><unstructured_citation>K. Govindaraju  and  S. Balamurali,  Tightened single-level  continuous  sampling  plan, Journal  of Applied   Statistics,  Vol.25, No. 4,  1998,  pp.451-461.</unstructured_citation></citation><citation key="ref7"><doi>10.1080/02664760410001681765a</doi><unstructured_citation>S. Balamurali  and  K. Subramali,  Modified  CSP-C Continuous Sampling plan for Consumer Protection,Journal  of  Applied  Statistics, Vol.31, No. 4, 2004, pp. 481-494.</unstructured_citation></citation><citation key="ref8"><unstructured_citation>P. Guayjarernpanishk  and  T. Mayureesawan,  The Design  of  Two-Level  Continuous  Sampling  Plan MCSP-2-C,Journal    of    Applied    Mathematical Sciences, Vol.6,No. 90, 2012, pp.4483-4495.</unstructured_citation></citation><citation key="ref9"><unstructured_citation>P. Guayjarernpanishk,  The  Fractional  Sampling Plan  for  Continuous  Production  Line,Far   East Journal  of  Mathematical  Sciences, Vol. 84,No. 2,2014, pp. 199-217.</unstructured_citation></citation><citation key="ref10"><unstructured_citation>P. Guayjarernpanishk,  The  Design  of  Continuous Sampling PlanG-TF-CSP, WSEAS Transactions on Mathematics, Vol.18, No. 40,2019, pp. 319-325.</unstructured_citation></citation><citation key="ref11"><unstructured_citation>S. Karlin, A  First  Course  in  Stochastic  Processes,Academic Press, 1996.</unstructured_citation></citation><citation key="ref12"><unstructured_citation>S.  M.  Ross, Stochastic  Processes,  2nded.,  John Wiley &amp; Sons, Inc., 1996.</unstructured_citation></citation><citation key="ref13"><unstructured_citation>K. S. Stephens, The    Handbook    of    Applied Acceptance    Sampling    Plans,    Procedures,    and Principles,American Society for Quality, 2001.</unstructured_citation></citation><citation key="ref14"><unstructured_citation>D.  C.  Montgomery, Introduction   to   Statistical Quality  Control, 6tded., John Wiley &amp; Sons, Inc., 2009.</unstructured_citation></citation><citation key="ref15"><unstructured_citation>E.  G.  Schilling  and  D.  V.  Neubauer, Acceptance Sampling  in  Quality  Control, 2nded.,  Taylor  &amp; Francis Group, 2009.</unstructured_citation></citation><citation key="ref16"><unstructured_citation>T. Mayureesawanand P. Sudasna-Na-Ayudthaya, A CSP-1-2L  Sampling  Plan  for  Inspection  of  Two Continuous Production  Lines, Journal  of  Research in Engineering and Technology. Vol. 2, No. 4, 2005, pp. 303-320.</unstructured_citation></citation><citation key="ref17"><unstructured_citation>Stephens, K.  S.,  “How  to  Perform  Continuous Sampling (CSP),” Vol. 2, ASQC Basic References in Quality  Control,  Statistical  Techniques,  American Society for Quality Control, Milwaukee, WI, 1979.</unstructured_citation></citation><citation key="ref18"><unstructured_citation>Course  Note  Stats  325, Stochastic   Processes, Department  of  Statistics,  University  of  Auckland,New Zealand, 2014, pp. 149-177.</unstructured_citation></citation><citation key="ref19"><unstructured_citation>S. W. Roberts,  States  of  Markov  chains  for evaluating continuous sampling plans,Transactions of  the  17th  Annual All  Day  Conference  on  Quality Control,Metropolitan  Section,  ASQC,  and  Rutgers University, New Brunswick, NJ, 1965, pp.106-111.</unstructured_citation></citation><citation key="ref20"><unstructured_citation>H. A. Lasater,  On  the  robustness  of  a  class  of continuous  sampling  plans  under  certain  types  of process   models,PhD     Dissertation, Rutgers University, New Brunswick, NJ, 1970.</unstructured_citation></citation></citation_list></journal_article></journal></body></doi_batch>