<?xml version="1.0" encoding="UTF-8"?>
<doi_batch xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/schema/5.5.0 https://www.crossref.org/schemas/crossref5.5.0.xsd" xmlns="http://www.crossref.org/schema/5.5.0" xmlns:jats="http://www.ncbi.nlm.nih.gov/JATS1" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:ai="http://www.crossref.org/AccessIndicators.xsd" version="5.5.0">
  <head>
    <doi_batch_id>wseas-12284-20261104071548-a6fd40</doi_batch_id>
    <timestamp>20261104071548945</timestamp>
    <depositor>
      <depositor_name>wseas/wseas</depositor_name>
      <email_address>wseas.group@gmail.com</email_address>
    </depositor>
    <registrant>WSEAS</registrant>
  </head>
  <body>
    <journal>
      <journal_metadata language="en">
        <full_title>International Journal of Electrical Engineering and Computer Science</full_title>
        <issn media_type="electronic">2769-2507</issn>
      </journal_metadata>
      <journal_issue>
        <publication_date media_type="online">
          <month>07</month>
          <day>06</day>
          <year>2026</year>
        </publication_date>
        <publication_date media_type="print">
          <month>07</month>
          <day>06</day>
          <year>2026</year>
        </publication_date>
        <journal_volume>
          <volume>8</volume>
        </journal_volume>
      </journal_issue>
      <journal_article publication_type="full_text" language="en">
        <titles>
          <title>Modeling the Impact of Construction Delay Factors on Organizational Reputation, Legal Exposure, and Market Competitiveness: Evidence from Madinah, Saudi Arabia</title>
        </titles>
        <contributors>
          <person_name sequence="first" contributor_role="author">
            <given_name>Aminu Ahmad</given_name>
            <surname>Aminu</surname>
            <affiliations>
              <institution>
                <institution_name>Faculty of Engineering, Department of Industrial Engineering Islamic University of Madinah, 42351, KINGDOM OF SAUDI ARABIA</institution_name>
              </institution>
            </affiliations>
          </person_name>
          <person_name sequence="additional" contributor_role="author">
            <given_name>Shamsuddin</given_name>
            <surname>Ahmed</surname>
            <affiliations>
              <institution>
                <institution_name>Faculty of Engineering, Department of Industrial Engineering Islamic University of Madinah, 42351, KINGDOM OF SAUDI ARABIA</institution_name>
              </institution>
            </affiliations>
          </person_name>
          <person_name sequence="additional" contributor_role="author">
            <given_name>Yazeed Abdullah</given_name>
            <surname>Alahmadi</surname>
            <affiliations>
              <institution>
                <institution_name>Faculty of Engineering, Department of Industrial Engineering Islamic University of Madinah, 42351, KINGDOM OF SAUDI ARABIA</institution_name>
              </institution>
            </affiliations>
          </person_name>
        </contributors>
        <jats:abstract xml:lang="en"><jats:p>Construction project delays impose substantial organizational consequences on contractors in Madinah, Saudi Arabia — a market characterized by Vision 2030 infrastructure pressures and religious tourism seasonality (Opening statement must be direct research impact from the analysis. This study advances beyond correlation-based approaches to model the specific mechanisms through which delay factors translate into reputational damage, legal exposure, and reduced capacity to secure new contracts, using a three-hypothesis structural framework. Data from N = 125 construction professionals were analyzed using Spearman's correlation, multiple regression, structural equation modeling (SEM) with Maximum Likelihood estimation, and moderated regression with mean-centered interaction terms. H1 established two empirically distinct pathways to reputational damage: a resource deprivation pathway (composite β = 0.328, p = 0.003, R² = 7.2%) and a process breakdown pathway dominated by stakeholder disputes (β = 0.263, p = 0.001) and scope changes (β = 0.183, p = 0.033), explaining approximately 13.2% of variance in REPUT. H2 was confirmed through an SEM model (CFI = 1.000, RMSEA = 0.000, χ²(3) = 2.006, p = 0.571), revealing two structurally distinct mediation pathways: material shortages generate legal exposure, which escalates to reputational damage and contract loss (MATRLS → LGRISK → REPUT/NEWCON, partial mediation), while stakeholder disputes reach contract loss exclusively through reputational damage (DISPTE → REPUT → NEWCON, full mediation). H3, testing professional experience as a moderator, was not supported at conventional significance levels (all interaction p &gt; 0.10), though experience showed a significant direct protective effect on contract loss (β = −0.144, p = 0.030). The findings establish that relational failure — not resource deficiency — is the primary reputational threat, and that the type of delay-causing event determines which consequence mechanism is activated. The research emphasizes the &quot;mediation&quot; aspect of research as stipulated in H2, showing how delays actually transform into the loss of new contracts through specific organizational risks.</jats:p></jats:abstract>
        <publication_date media_type="online">
          <month>11</month>
          <day>04</day>
          <year>2026</year>
        </publication_date>
        <publication_date media_type="print">
          <month>11</month>
          <day>04</day>
          <year>2026</year>
        </publication_date>
        <pages>
          <first_page>152</first_page>
        </pages>
        <publisher_item>
          <item_number item_number_type="article_number">12</item_number>
        </publisher_item>
        <ai:program name="AccessIndicators">
          <ai:free_to_read/>
          <ai:license_ref applies_to="vor" start_date="2026-11-04">https://creativecommons.org/licenses/by/4.0/</ai:license_ref>
        </ai:program>
        <doi_data>
          <doi>10.37394/232027.2026.8.12</doi>
          <resource>https://wseas.com/journals/articles.php?id=12284</resource>
        </doi_data>
        <citation_list>
          <citation type="journal_article" key="ref1"><unstructured_citation>A.M. Alajmi and Z. Ahmed Memon, A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects, Smart Cities, Vol. 5, No. 4, 2022, pp. 1465-1487.</unstructured_citation></citation>
          <citation type="journal_article" key="ref2"><unstructured_citation>S.A. Assaf and S. Al-Hejji, Causes of delay in large construction projects, International Journal of Project Management, Vol. 24, No. 4, 2006, pp. 349-357.</unstructured_citation></citation>
          <citation type="journal_article" key="ref3"><unstructured_citation>A. Alshammari and F.E.M. Ghazali, A Comprehensive Review of the Factors and Strategies to Mitigate Construction Projects Delays in Saudi Arabia, The Open Construction and Building Technology Journal, Vol. 18, No. 1, 2024.</unstructured_citation></citation>
          <citation type="journal_article" key="ref4"><unstructured_citation>A. Bin Seddeeq, S. Assaf, A. Abdallah and M.A. Hassanain, Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry, Buildings, Vol. 9, No. 2, 2019, p. 41.</unstructured_citation></citation>
          <citation type="journal_article" key="ref5"><unstructured_citation>J.A. Alsuliman, Causes of delay in Saudi public construction projects, Alexandria Engineering Journal, Vol. 58, No. 2, 2019, pp. 801-808.</unstructured_citation></citation>
          <citation type="journal_article" key="ref6"><unstructured_citation>E. Alenazi, Z. Adamu and A. Al-Otaibi, Exploring the Nature and Impact of Client-Related Delays on Contemporary Saudi Construction Projects, Buildings, Vol. 12, No. 7, 2022, p. 880.</unstructured_citation></citation>
          <citation type="journal_article" key="ref7"><unstructured_citation>N.H. Al-Emad and S. Nagapan, Identification of Delay Factors from Mecca's Construction Experts Perspective, International Journal of Sustainable Construction Engineering and Technology, Vol. 6, No. 2, 2015, pp. 16-25.</unstructured_citation></citation>
          <citation type="journal_article" key="ref8"><unstructured_citation>R.K.M. Gopang, Q.B. Imran and S. Nagapan, Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects, International Journal of Sustainable Construction Engineering and Technology, Vol. 11, No. 2, 2020, pp. 225-233.</unstructured_citation></citation>
          <citation type="journal_article" key="ref9"><unstructured_citation>A. Al-Kharashi and M. Skitmore, Causes of delays in Saudi Arabian public sector construction projects, Construction Management and Economics, Vol. 27, No. 1, 2009, pp. 3-23.</unstructured_citation></citation>
          <citation type="journal_article" key="ref10"><unstructured_citation>J. Wepari, M. Donkor and E. Kusi, Mitigating the effects of delay risk in building construction projects in Ghana, Cogent Engineering, Vol. 11, 2024.</unstructured_citation></citation>
          <citation type="journal_article" key="ref11"><unstructured_citation>K. Berta and M. Tesfaye, Determinants of road construction project delay in the case of Woliso-Ambo road construction, Scientific Reports, Vol. 15, 2025.</unstructured_citation></citation>
          <citation type="journal_article" key="ref12"><unstructured_citation>B. Indhu and K. Yogeswari, Structural Equation Modelling (SEM) Approach On Inappropriate Construction Equipment Delay Factors, Civil Engineering Journal, Vol. 7, No. 10, 2021.</unstructured_citation></citation>
          <citation type="journal_article" key="ref13"><unstructured_citation>M. Purushothaman, L. Pedro and A. Ghaffarianhoseini, Construction projects: interactions of the causes of delays, Smart and Sustainable Built Environment, 2024.</unstructured_citation></citation>
          <citation type="journal_article" key="ref14"><unstructured_citation>A.K.S. Alshakhrit, E.E. Supeni and N.I. Zahari, Causes and Effects of Delays in Saudi Arabian Construction Projects, Journal of Global Economics, Management and Business Research, 2019, pp. 165-174.</unstructured_citation></citation>
          <citation type="journal_article" key="ref15"><unstructured_citation>S. Al-Busaltan, Building Information Modelling (BIM) as an Efficient Solution to Middle Eastern Construction Project Delays, Engineering, Technology and Applied Science Research, Vol. 15, No. 1, 2025, pp. 19484-19491.</unstructured_citation></citation>
          <citation type="journal_article" key="ref16"><unstructured_citation>H. Doloi, Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects, Journal of Construction Engineering and Management, Vol. 139, No. 3, 2013, pp. 267-279.</unstructured_citation></citation>
          <citation type="journal_article" key="ref17"><unstructured_citation>A. Chadee, H. Ali, S. Gallage and U. Rathnayake, Modelling the Implications of Delayed Payments on Contractors' Cashflows on Infrastructure Projects, Civil Engineering Journal, Vol. 9, No. 1, 2023, pp. 52-71.</unstructured_citation></citation>
          <citation type="journal_article" key="ref18"><unstructured_citation>F. Antoniou and A. Tsioulpa, Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance, Buildings, Vol. 14, No. 2, 2024, p. 333.</unstructured_citation></citation>
          <citation type="journal_article" key="ref19"><unstructured_citation>T. Hanák and E. Vítková, Causes and effects of contract management problems: Case study of road construction, Frontiers in Built Environment, Vol. 8, 2022, p. 1009944.</unstructured_citation></citation>
          <citation type="journal_article" key="ref20"><unstructured_citation>H. Yao, Y. Chen and Y. Tang, Contract Violations in the Construction Projects: How Contractual Obligations are Reached Affects Contractual and Reputational Enforcement, IEEE Transactions on Engineering Management, Vol. 71, 2024, pp. 7160-7172.</unstructured_citation></citation>
          <citation type="journal_article" key="ref21"><unstructured_citation>A. Habetemeherit, D. Mengistu, F. Sorsa and B. Tesfaye, Causes and impacts of public construction projects' contract terminations, Engineering, Construction and Architectural Management, 2025.</unstructured_citation></citation>
          <citation type="journal_article" key="ref22"><unstructured_citation>D. Osei-Asibey, J. Ayarkwa, B. Baah, A. Afful, G. Anokye and P. Nkrumah, Impact of time-based delay on public-private partnership (PPP) construction project delivery, Journal of Financial Management of Property and Construction, 2024.</unstructured_citation></citation>
          <citation type="journal_article" key="ref23"><unstructured_citation>J. Tariq and S.S. Gardezi, Study the delays and conflicts for construction projects and their mutual relationship: A review, Ain Shams Engineering Journal, Vol. 14, No. 1, 2023, p. 101815.</unstructured_citation></citation>
          <citation type="journal_article" key="ref24"><unstructured_citation>A.A. Shash and F.M. AbuAlnaja, Causes of material delays in capital projects in Saudi Arabia, International Journal of Construction Management, Vol. 23, No. 7, 2023, pp. 1109-1117.</unstructured_citation></citation>
          <citation type="journal_article" key="ref25"><unstructured_citation>L. Rivera, H. Baguec and C. Yeom, A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries, Infrastructures, Vol. 5, No. 10, 2020, p. 84.</unstructured_citation></citation>
          <citation type="journal_article" key="ref26"><unstructured_citation>G. Agyekum-Mensah and A. Knight, The professionals' perspective on the causes of project delay in the construction industry, Engineering, Construction and Architectural Management, Vol. 24, No. 5, 2017, pp. 828-841.</unstructured_citation></citation>
          <citation type="journal_article" key="ref27"><unstructured_citation>B. Ajayi and T. Chinda, Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach, Frontiers in Built Environment, Vol. 8, 2022, p. 799314.</unstructured_citation></citation>
          <citation type="journal_article" key="ref28"><unstructured_citation>A. Rauzana and W. Dharma, Causes of delays in construction projects in the Province of Aceh, Indonesia, PLoS ONE, Vol. 17, 2022.</unstructured_citation></citation>
          <citation type="journal_article" key="ref29"><unstructured_citation>J. Yap, P. Goay, Y. Woon and M. Skitmore, Revisiting critical delay factors for construction: Analysing projects in Malaysia, Alexandria Engineering Journal, Vol. 60, 2020.</unstructured_citation></citation>
          <citation type="journal_article" key="ref30"><unstructured_citation>E. De Almeida, V. Da Silva Feitoza, M. Carvalho, A. Piña, L. Araújo and L. Aidar, Study of delays in constructions: a managerial point of view of private companies in Brasilia, Brazil, Gestão and Produção, Vol. 28, 2021.</unstructured_citation></citation>
          <citation type="journal_article" key="ref31"><unstructured_citation>C. Murillo, E. Cabezas, M. Chalen and D. Hidrovo, Analysis of Organizational Factors and Performance in BIM Projects: Empirical Evidence from the Latin American Construction Industry, INTRA: Interdisciplinary Research and Analysis Journal, Vol. 2, No. 1, 2025.</unstructured_citation></citation>
          <citation type="journal_article" key="ref32"><unstructured_citation>H. Doloi, A. Sawhney and K.C. Iyer, Structural equation model for investigating factors affecting delay in Indian construction projects, Construction Management and Economics, Vol. 30, No. 10, 2012, pp. 869-884.</unstructured_citation></citation>
          <citation type="journal_article" key="ref33"><unstructured_citation>M.Z. Ramli et al., A Review of Structural Equation Model for Construction Delay Study, International Journal of Engineering and Technology, Vol. 7, No. 4.35, 2018, pp. 299-306.</unstructured_citation></citation>
          <citation type="journal_article" key="ref34"><unstructured_citation>J.-B. Yang and S.-F. Ou, Using structural equation modeling to analyze relationships among key causes of delay in construction, Canadian Journal of Civil Engineering, Vol. 35, No. 4, 2008, pp. 321-332.</unstructured_citation></citation>
          <citation type="journal_article" key="ref35"><unstructured_citation>R.D. Retherford and M.K. Choe, Statistical Models for Causal Analysis, John Wiley and Sons, 2011.</unstructured_citation></citation>
          <citation type="journal_article" key="ref36"><unstructured_citation>A.M.F. Albtoush et al., Critical success factors of construction projects in Jordan: an empirical investigation, Asian Journal of Civil Engineering, Vol. 23, No. 7, 2022, pp. 1087-1099.</unstructured_citation></citation>
          <citation type="journal_article" key="ref37"><unstructured_citation>S. Famiyeh, C.T. Amoatey, E. Adaku and C.S. Agbenohevi, Major Causes of Construction Time and Cost Overruns, Journal of Engineering, Design and Technology, Vol. 15, No. 2, 2017, pp. 181-198.</unstructured_citation></citation>
          <citation type="journal_article" key="ref38"><unstructured_citation>M.I. Hoque, M.A. Safayet, M.J. Rana, A.Y. Bhuiyan and G.S. Quraishy, Analysis of Construction Delay for Delivering Quality Project in Bangladesh, International Journal of Building Pathology and Adaptation, Vol. 41, No. 2, 2021, pp. 401-421.</unstructured_citation></citation>
          <citation type="journal_article" key="ref39"><unstructured_citation>N. Al-Emad, Construction Workers' Issues From Worldwide and Saudi Arabia Studies, International Journal of Sustainable Construction Engineering and Technology, Vol. 12, No. 4, 2021, pp. 85-100.</unstructured_citation></citation>
          <citation type="journal_article" key="ref40"><unstructured_citation>M. Sanni-Anibire, M. Zin and S. Olatunji, Causes of delay in the global construction industry: a meta analytical review, International Journal of Construction Management, Vol. 22, No. 8, 2020, pp. 1395-1407.</unstructured_citation></citation>
          <citation type="journal_article" key="ref41"><unstructured_citation>L. Hu and P.M. Bentler, Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives, Structural Equation Modeling: A Multidisciplinary Journal, Vol. 6, No. 1, 1999, pp. 1-55.</unstructured_citation></citation>
          <citation type="journal_article" key="ref42"><unstructured_citation>P.M. Bentler, Comparative fit indexes in structural models, Psychological Bulletin, Vol. 107, No. 2, 1990, pp. 238-246.</unstructured_citation></citation>
          <citation type="journal_article" key="ref43"><unstructured_citation>M.W. Browne and R. Cudeck, Alternative ways of assessing model fit, in K.A. Bollen and J.S. Long (eds), Testing Structural Equation Models, Sage Publications, 1993, pp. 136-162.</unstructured_citation></citation>
          <citation type="journal_article" key="ref44"><unstructured_citation>R.B. Kline, Principles and Practice of Structural Equation Modeling, 5th edn., Guilford Press, 2023.</unstructured_citation></citation>
          <citation type="journal_article" key="ref45"><unstructured_citation>J. Cohen, P. Cohen, S.G. West and L.S. Aiken, Applied Multiple Regression/Correlation Analysis for the Behavioral Sciences, 3rd edn., Lawrence Erlbaum Associates, 2003.</unstructured_citation></citation>
          <citation type="journal_article" key="ref46"><unstructured_citation>L.S. Aiken and S.G. West, Multiple Regression: Testing and Interpreting Interactions, Sage Publications, 1991.</unstructured_citation></citation>
          <citation type="journal_article" key="ref47"><unstructured_citation>P.A. Frazier, A.P. Tix and K.E. Barron, Testing Moderator and Mediator Effects in Counseling Psychology Research, Journal of Counseling Psychology, Vol. 51, No. 1, 2004, pp. 115-134.</unstructured_citation></citation>
          <citation type="journal_article" key="ref48"><unstructured_citation>K. Salman and A. Abdulghafour, Stakeholders' Insight on the Delay of Constructions Projects in the Makkah Region-KSA, Open Civil Engineering Journal, Vol. 15, 2021.</unstructured_citation></citation>
        </citation_list>
      </journal_article>
    </journal>
  </body>
</doi_batch>
